Projects

CE Partners breadth of experience spans solar, hydrogen, energy storage systems and key infastructure projects across Australia.

TIWI ISLANDS HYDROGEN

CE Partners has been engaged to provide:

Project Advisory Services - Project Management - Engineering Management - Project Optimisation

Provaris plans to develop a green hydrogen export project located on the Tiwi Islands, with up to 2.8 Gigawatts (GW) of solar generating capacity and producing up to 100,000 tonnes per annum of green hydrogen. Operational 2027.

Cohuna Solar Farm

CE Partners provided:

Project Management - Engineering Management - Connection & Commissioning

Cohuna Solar Farm is a 34.2 MW DC single axis tracking project located in Victoria. Cohuna generates up to 77 GWh each year, avoiding the annual emission of around 71,000 tonnes of CO2 into the atmosphere. The project is connected to the local distribution grid through the Cohuna Zone Substation. Operational July 2020.

Gannawarra solar farm

CE Partners provided:

Project Management - Engineering Management - Connection & Commissioning

The Gannawarra Solar Farm is a 60 MW DC single-axis tracking project located in Victoria. It is the first large-scale solar farm to be constructed with an integrated Energy Storage System – a 25MW / 50MWh Tesla Powerpack battery. Operational March 2018.

Gannawarra Energy Storage System

CE Partners provided:

Project Advisory Services - Project Management - Engineering Management - Project Optimisation - Connection & Commissioning

Gannawarra Energy Storage System (GESS) was selected by the Victorian Government under its Energy Storage Initiative to integrate a 25MW / 50MWh Tesla Powerpack battery with the 50MW GSF to enhance the reliability of the grid in the North West region of Victoria. Operational January 2019.

Wemen solar farm

CE Partners provided:

Project Management - Engineering Management - Connection & Commissioning

Wemen solar farm is a single-axis tracking project located in Victoria. The site has an installed capacity of approx. 110 MWp, spanning across an area close to 700 acres. Wemen is considered one of the largest solar operations in the state of Victoria. Operational March 2019.

RODDS BAY SOLAR FARM

CE Partners provided:

Project Advisory Services - Engineering Management - Project Optimisation

Rodds Bay Solar Farm is a proposed 300 megawatt solar farm, located near Bororen, approximately 50 kilometres south of Gladstone, Queensland. The project will comprise high-efficiency photovoltaic (PV) modules and a battery-storage installation of 82 megawatts of storage. Not yet operational.

SOUTHWEST PIPELINE

CE Partners provided:

Engineering Management

The South West Pipeline is the second stage of the Beaudesert Water Supply Upgrade, a long-term water supply solution for the Scenic Rim in QLD. The $95 million, 27 km pipeline will connect two recently-built reservoirs at the existing Beaudesert Water Treatment Plant to the SEQ Water Grid. Currently under construction.

PARADISE SOUTH

CE Partners provided:

Project Management - Engineering Management - Owners Engineering

Paradise South is an open cut mining operation that excavates up to two million tonnes of phosphate ore per annum over an initial 20 year mine life. The mine includes a processing plant onsite to produce the phosphate concentrate product ready for domestic and international markets.

Clermont Solar Farm

Clermont Solar Farm is a single-axis tracking project, located the town of Clermont, 106km north of Emerald, Queensland. The site has an installed capacity of approx. 89 MWp DC and will spans an area of approximately 497 acres. Operational June 2019.